World record in underwater inspection at Chixoy Hydroelectric Power Plant in Guatemala
12,750 m (from the intake) and 13,058 m (from the equilibrium chimney) were covered, acquiring data on the entire 25,806 m tunnel. Breaking twice the record previously obtained in 2017 in Peru of 12,322 m”